Tunnel-type forced ventilation load bank
Modular design
Delta Resistance offers a range of standardized forced-ventilation load banks up to 1200KW.
Above 1200KW, our design office will provide you with a customized offer.
Horizontal ventilation is standard - vertical ventilation is available according to your specifications.
Tests and Standards - circular of December 8, 2006
DHOS/E4 circular no. 2006-393
By law, generator sets must be fully tested (load ramp-up - full load - load impact). Faced with the frequency of new standards for buildings open to the public, the acquisition of test equipment is rapidly proving to be cost-effective, and gives you total control over your resources.
Warning: there is confusion between reactive power in KVoltsAmperes and power in Watt. A 100KVA generator MUST BE TESTED AT 100KW RESISTIVE. The conversion with a factor of P (W)= 0.8 P (VA) only concerns the calculation to size a generator in front of a reactive load (motor, capacitors, filters...) ALL REQUESTS GO TO THE DESIGN OFFICE .
THE OFFER YOU WILL RECEIVE WILL MEET YOUR TECHNICAL REQUIREMENTS
Options | Realizations
Our design office is equipped with CAD&CAM, two platforms for dielectric testing and heat testing.
You can choose from the following options in your request (link):
- Multi-voltage loadbanks
- Medium and high voltage
- Control box manual section control
- Automatic power-up
- Measurement - Recording power measurement - data export
- 316L stainless steel frame - enhanced corrosion resistance
- Cos phi setting inductive or capacitive
- 316 stainless steel resistors Resistance to saline atmosphere
- Résistance R135 et R80 Ni-Cr faible dérive < 5% et haute précision 2%
- Seismic resistance
Request a quote
Response within 24 hours