Automated discharge bench

Thanks to the engineers in our design office and the expertise of the group, we can study and integrate automation systems.

Information statement

The standard requires regular inspection of emergency generators. Tests must be recorded and may be requested.

We offer a measurement system with export to USB and are currently working on printing a more reliable paper report.

Custom automation

Thanks to the expertise of our group, Delta Résistances has a whole design office specializing in special machines and the assembly of control and supervision cabinets.


Request for quotation

Response within 24 business hours






    yesno


    yesno




    yesno


    yes (IP20)no (IP23)


    yesno

    integrateddeported


    mm


    mm


    mm


    electromechanicalAutomated system